Before you weigh up an electronic shelf label investment, see the annual labour and printing cost of your current paper label process.
Some fields hold an invalid value; no result is calculated until they are corrected.
Manual label changes per year
—
Staff hours per year
—
Approximate working days
—
8 hours/day
Labour cost per year
—
Printing consumable cost per year
—
Calculated annual manual label cost
—
How is this calculated?
- We work out how many labels are replaced by hand over a year.
- We find how many staff hours those replacements take.
- Staff cost and printing consumable cost are calculated separately.
- The two are combined into the annual cost of running labels by hand.
What is included
- Time to prepare and replace labels
- Staff cost
- Paper, toner or other printing consumables
What is not included
- The project and investment cost of the VyTag system
- The cost of price differences between shelf and till
- Wrong or repeated prints
- Delayed promotions
- Customer complaints
- Other indirect costs inside the operation
This calculation is a preliminary assessment based only on the information you enter. It is not a firm project quote or a return-on-investment calculation. Amounts are in the currency you entered.
How does VyTag change the labelling operation?
- Prices and promotions are updated centrally.
- The workload of printing and swapping labels by hand goes down.
- Several stores can be managed from a single panel.
- What the shelf shows is managed together with the live price source.
Quote 
Get a Quote
We will respond to your request as soon as possible.
Talebiniz alındı
Ekibimiz en kısa sürede size dönecek. Teşekkür ederiz.
